News Details

What are the precautions for the installation of the movable partition?

time:

2024-11-14 09:58

1. **Pre-preparation * *

-**Accurate measurement**: Before installing the movable partition, the space should be accurately measured. Including the height of the room, width, length, and ground flatness, wall verticality. Use professional measurement tools such as laser rangefinder and level meter to ensure that the data error is within the allowable range. For example, when installing a conference room partition, the height measurement error should be controlled within ± 5mm, and the width error should be controlled within ± 10mm, so as not to affect the installation and use of the partition.

-**Site cleaning**: Clean the installation site to remove debris, dust and obstacles. If the ground is not flat, you need to leveling treatment, otherwise it will affect the stability of the partition. For places with special requirements, such as hospital operating rooms or laboratories, the cleanliness of the site must meet high standards of dust-free and sterile requirements.

-**Product inspection**: Carefully inspect the movable partition product to see if it is damaged, deformed or missing parts. Check whether the material, size, color, etc. of the partition are consistent with the order. At the same time, check whether the accessories such as track, pulley, handle, etc. are complete and qualified.

-**Tool preparation**: Prepare a complete set of installation tools, such as electric drills, screwdrivers, wrenches, hammers, etc. Ensure that the tools are intact and have sufficient power or power. According to the installation instructions, special tools may be required, such as special rail mounting fixtures.

2. **Track Installation * *

-**Track position and levelness**: Determine the installation position of the track, whether it is the ground track or the ceiling track, it must be horizontal and vertical. Use a level to calibrate, and the horizontal deviation per meter of the track shall not exceed 2mm. For longer tracks, check the calibration in sections to prevent accumulated errors.

-**Track fixing**: Choose the appropriate fixing method and fixing parts. The ground track is generally fixed with expansion bolts or chemical anchor bolts, and the appropriate bolt type is selected according to the ground material (such as cement, ceramic tile, etc.). When fixing, the bolt spacing should be reasonable, usually one every 30 - 50cm to ensure that the track is firmly installed on the ground or ceiling.

-**Track cleaning and lubrication**: After installing the track, clean the inside of the track to remove dust, debris, etc. Can be cleaned with a brush, and then blown off with compressed air. After cleaning, apply an appropriate amount of lubricant, such as special track grease or silicone oil, in the track to ensure smooth operation of the pulley.

3. **Partition Installation * *

-**Pre-assembly inspection**: Before installing the partition on the track, pre-assemble it on the ground. Check whether the connection between the partition panels is tight and seamless, and whether the connecting parts are firm. If the panel is found to be deformed or damaged, it should be replaced in time.

-**Weight balance and installation sequence**: For large or multi-panel partitions, pay attention to weight balance. The partition can be divided into several parts and installed separately to ensure that the weight of each part is evenly distributed on the track. The installation sequence generally starts from one end, and the partition panel is installed on the track in turn, taking care not to damage the track and pulley.

-**Verticality adjustment**: During the installation process, use a plumb line or a laser verticality meter to check the verticality of the partition. Every time a panel is installed, check whether it is vertical. If verticality deviation is found, it can be corrected by adjusting the adjusting feet or connecting parts at the bottom of the partition to ensure that the entire partition is installed vertically.

-**Sealing treatment**: When installing the partition, pay attention to the sealing treatment. Install sealing materials, such as rubber sealing strips, at the contact parts between the partition and the ground, wall and ceiling. Ensure that the sealing strip fits tightly without gaps. For corners, use special corner seals or cut sealing strips to make them fit tightly to ensure good sound insulation and dustproof effects.

4. **Check and debug after installation * *

-**Appearance inspection**: Check the appearance of the partition, including surface flatness, color consistency, splicing gap size, etc. The surface should be flat and smooth, without obvious scratches, dents or protrusions; the color should be uniform, without color difference; the splicing gap should be tight and uniform, and the width should meet the requirements (generally not more than 3mm).

-**Function check**: Check the moving function of the partition to ensure that the partition can move smoothly on the track without jamming or blocking. Check the sound insulation effect and feel whether the sound insulation meets the design requirements by making sound on both sides of the partition. At the same time, check the sealing performance to see if there is light leakage and air leakage.

-**Safety check**: Check whether the partition is firmly installed and whether there are loose parts. Especially for tall partitions, to ensure its stability, to prevent dumping. For movable partitions with electric devices, check whether the circuit system is safe and whether there is any risk of leakage.